|
|
|

Solicitation Details
| Solicitation: |
DCKG-2010-R-0015 |
| Caption: |
Design and Installation of a Linear Bioretention Structure to Treat Runoff from Jay Street, NE |
| Subcontracting Requirement: |
35% SBE |
| Status: |
Closed
|
System date: 11/23/2009
System time: 12:24:59 am
| NIGP Code: |
9253500 |
| NIGP Description: |
Environmental Engineering |
| Market Type: |
Open |
| Work Site Location: |
Pope Branch Stream, a tributary of the Anacostia River |
| Solicitation Type: |
RFP |
| Sol. Pick-Up Location: |
www.ocp.dc.gov |
| Solicitation Fee (Non-Refundable) -- Board Number: |
|
| Issuance Date: |
10/30/2009 |
Contact: |
Tonya Mills |
| Original/Closing Date: |
11/12/2009
|
Agency: |
DRES |
| Closing Time: |
2:00:00 pm |
Phone: |
202-671-2255 |
| Last Changed: |
|
Fax: |
202-442-2613 |
| Modified Opening/Closing Date: |
|
Email: |
tonya.mills@dc.gov
|
Synopsis:
The Government of the District of Columbia, Department of Real Estate Services, Contracting and Procurement is requesting on behalf of The District Department of the Environment (DDOE), technical proposals from selected architect and engineer (A/E) firms to design and install a linear bioretention structure to treat runoff from Jay Street, NE. The work shall include the preparation of drawings and specifications, obtaining necessary permits, site preparation, and constructing a linear bio-retention structure in accordance with the Scope of Work. This procurement is being funded by the District of Columbia with funds made available by the American Recovery and Reinvestment Act of 2009, P.L. 111-5 (Recovery Act). The Contractor will be subject to the additional requirements included in the solicitation.
| Pre-proposal Conference Date and Time: |
|
| Pre-proposal Conference Location: |
|
Please read the disclaimer.
Associated Documents for Solicitation: DCKG-2010-R-0015
|

* This document is presented in Portable Document Format (PDF). A PDF reader is required for viewing.
Download a PDF Reader or Learn More About PDFs.
|

|
|
|
|
|
| |