Office of Contracting and Procurement
DC Home Mayor Fenty DC Guide Residents Business Visitors DC Government Kids

Office of Contracting and Procurement

Hide sub-linksOCP HOME
About OCP
How to Reach Us
Ask the CPO
News Room
FOIA Requests
FAQs
Employment Opps
Helpful Links
Performance
Sitemap
 
Hide sub-linksSERVICES
DC Supply Schedule
Live Video Broadcast OCP Bid Openings
Vendor Registration
 
Hide sub-linksINFORMATION
27 DCMR
Agencies Served
Agency Calendar
Business Opportunities
Business Requirements
Contract Awards
Excluded Parties List
Información para
  Vendedores en Español
Living Wage Act of 2006
NIGP Codes
OCP Policies
Personal Property
  Divison (PPD)
Procurement Forecast
Reverse Auctions
Small, Local, and
  Disadvantaged
Solicitation Attachments
 
ONLINE SERVICE
  REQUESTS

Solicitation Details

Solicitation: DCKG-2010-R-0014
Caption: Design and Installation of a Regenerative Stormwater Conveyance for an Intermittent Stream that Discharges Near Milkhouse Ford in the Main Stem of Rock Creek
Subcontracting Requirement:   35% SBE
Status: Closed

System date: 11/23/2009
System time: 12:28:13 am

NIGP Code: 9253500
NIGP Description: Environmental Engineering
Market Type: Open
Work Site Location: Pope Branch Stream, a tributary of the Anacostia River
Solicitation Type: RFP
Sol. Pick-Up Location: www.ocp.dc.gov
Solicitation Fee (Non-Refundable) -- Board Number:

Issuance Date: 10/30/2009 Contact: Tonya Mills
Original/Closing Date: 11/12/2009 Agency: DRES
Closing Time: 2:00:00 pm Phone: 202-671-2255
Last Changed: Fax: 202-442-2613
Modified Opening/Closing Date: Email: tonya.mills@dc.gov

Synopsis:

The Government of the District of Columbia, Office of Property Management, Contracting and Procurement is requesting on behalf of The District Department of the Environment (DDOE), technical proposals from selected architect and engineer (A/E) firms to design and install regenerative stormwater conveyance for an intermittent stream that discharges near Milkhouse Ford in the main stem of Rock Creek. The work shall include the preparation of drawings and specification, obtaining necessary permits, and construct on a regenerative stormwater conveyance in accordance with the Scope of Work. This procurement is being funded by the District of Columbia with funds made available by the American Recovery and Reinvestment Act of 2009, P.L. 111-5 (Recovery Act). The Contractor will be subject to the additional requirements included in the solicitation.


Pre-proposal Conference Date and Time:
Pre-proposal Conference Location:

Please read the disclaimer.

Associated Documents for Solicitation: DCKG-2010-R-0014

Title Date Size  

Main Document* 11/4/2009 107 KB  

* This document is presented in Portable Document Format (PDF). A PDF reader is required for viewing. Download a PDF Reader or Learn More About PDFs.