Office of Contracting and Procurement


Solicitation Details

Solicitation: DCKA-2016-B-0040
Caption: Minnesota Avenue Revitalization Phase II
Subcontracting Requirement:   DBE 6%
Status: Closed

System date: 10/23/2017
System time: 11:23:29 am

NIGP Code: 9315300
NIGP Description: Lighting Fixtures Maintenance and Repair
Market Type: Open
Work Site Location: 300 South of Benning Road, NE to Sheriff Road, NE
Solicitation Type: IFB
Sol. Pick-Up Location: http://DTAP.DDOT.dc.gov- Questions concerning the solicitation should be directed to minnesotaphase2.revitalization@dc.gov
Solicitation Fee (Non-Refundable) -- Board Number:

Issuance Date: 3/13/2017 Contact: Joyce Timmons
Original/Closing Date: 5/2/2017 Agency: DDOT
Closing Time: 5/2/2017 2:00:00 pm Phone: (202) 671-2272
Last Changed: Fax: (202) 671-1210
Modified Opening/Closing Date: Email: joyce.timmons@dc.gov

Synopsis:

Work under this contract consists of revitalization of Minnesota Avenue from 300 feet south of Benning Road, N.E. intersection to Sheriff Road, N.E. The work includes; but is not limited to, the following items: Removal of existing asphalt and PCC pavement, reconstruct pavement using flexible asphalt pavement, construct granite curb and concrete gutter, reconstruct PCC driveway entrances with and without exposed aggregate treatment as shown in the drawings.


Pre-proposal Conference Date and Time: 3/20/2017 10:00:00 am
Pre-proposal Conference Location: 55 M Street, SE, 4th Floor Conference 639

Please read the disclaimer.

Associated Documents for Solicitation: DCKA-2016-B-0040

Title Date Size  

Amendment 1 3/20/2017 103 KB  
Amendment 2 4/4/2017 288 KB  
Amendment 3 4/14/2017 427 KB  
Amendment 4 4/24/2017 106 KB  
Amendment 5 4/26/2017 148 KB  

* This document is presented in Portable Document Format (PDF). A PDF reader is required for viewing. Download a PDF Reader or Learn More About PDFs.